Friday, November 16

pouring concrete

Last week we poured some concrete for the foley stage concrete surface.  The pits in our breakaway floors are 4 feet long, thirty inches wide, and 8 inches deep.

After several days of curing the concrete has turned out very nice.  I was a total of 5 full bags to fill the pit, and the resulting slab has zero ringing to it and a very nice surface texture.

apologies in advance for the blurry photos.








1 comment:

  1. That looks really good!
    You should post some samples.
    bye!

    ReplyDelete