I can work on your project.

Find me! Call DAP at 214.350.7678 or email rene@dallasaudiopost.com. Also check out echocollectivefx.com for custom sfx, and tonebenders.net for my podcast.

Friday, November 16

pouring concrete

Last week we poured some concrete for the foley stage concrete surface.  The pits in our breakaway floors are 4 feet long, thirty inches wide, and 8 inches deep.

After several days of curing the concrete has turned out very nice.  I was a total of 5 full bags to fill the pit, and the resulting slab has zero ringing to it and a very nice surface texture.

apologies in advance for the blurry photos.








1 comment:

Unknown said...

That looks really good!
You should post some samples.
bye!